Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line

PET Bottled Drinking Water Filling Machine / Mineral Water Production LineCharacteristics:1. This drinking water filling machine is a unique design combining the three machines of bottle washing , filling and capping in one to decrease 

Featured Products

PET Bottled Drinking Water Filling Machine / Mineral Water Production Line
Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line
Characteristics:
1. This drinking water filling machine is a unique design combining the three machines of bottle washing , filling and capping in one to decrease main power, to save space and to diminish the air pollution 
among the three machines.
2. The water filling machine is easy to change the shape of bottles, which can be done by changing thet humb wheel without adjusting the height of the machine.
3. The bottle drinking water filling machine case and the parts contacting with the materials are made ofstainless steel which ensures the 
good external look and easy washing.
4. Each drinking water machine element tha contacts with the liquid is made of high quality Stainless steel 304, if needed,Stainless steel 
is also available.
5. The automatic drinking water filling machine adopts bottle neck holding transmission technology to realize fully automatic rinsing,  filling and capping.
6. Most elements of the electrical system use famous international brand, for example,Mitsubish,Omron 
brand .
7. The bottle water filling machine obtain the advantages of good abrasive resistance,high stability,low failure rate, etc. The quality of the 
equipments reaches the advanced level of the world.
8. Nozzles in the grab can guarantee the complete wash of the interior of the bottle.
9. Easy to operate, save the cost for workers.
 
Washing Part
Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line

Filling Part
Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line

Capping Part
Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line
 
Technical Parameters
ModelCGF8-8-3CGF16-12-6CGF18-18-6CGF24-24-8CGF32-32-10CGF40-40-10
Rinsing Head No81618243240
Filling Head No81218243240
Capping Head No36681012/10
RatedCapacity
(500ml)
2000BPH4000BPH7000-8000BPH10000-12000BPH12000-15000BPH15000-18000BPH
Overall Size1900*1420
*2000mm
2200*1600
*2300mm
2450*1900
*2300mm
2750*2180
*2400mm
4000*2300
*2300mm
4550*2650
*2300mm
Weight1.5T2.2T3.0T4.0T8.0T12.0T
Power(KW)3.0kw3.5kw4.0kw4.8kw7.6kw8.3Kw
Rated Voltage380V380V380V380V380V380V
 
Operation
Empty bottles are fed manually onto the in feed Air conveyor.
From there bottles are carried to the Rinsing section.
Bottles gripped by neck & get tilted on rinsing nozzles.
Rinsed bottles are coming straight & get transferred to the filling section& are holded by neck.
Filled bottles are transferred to the capping section.
Caps are put in the rotary hopper & tightened under the revolving capping heads, while coming out by
out feed conveyor.
 
Reliable FAQ
Q1:Are you a trading company or a manufactory?
A1:We are a manufactory,can give u best service .
 
Q2:What's your guarantee or the warranty of the quality if we buy your machines?
A2:We offer you high quality machines with 13 months guarantee . we will give u spare part free in 13 months
 
Q3:When can I get my machine after I paid?
A3:We will deliver the machines on time as the date we agreed both side.
 
Q4:How can I install my machine when it arrives?
A4:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines.
 
Q5:How about the spare parts?
A5:After we deal down all the things , we will offer you a spare parts list for your reference
 
Terms & Conditions
1. Payment Method :
30%  by T/T as down payment, 70% by T/T before shipment.
2 . Mechanical Warranty :
Warranty:13 months after installation
3. Delivery & Packing :
Delivery Time: 30 working days after get down payment samples
Coming Document:
1) Complete instruction manual in English language
2) Complete Document for customer to clear its customs
4. Install in Spot :
1) Engineer oversea service to install machines. Engineer's Installation fee is 60-100USD, Two-way air tickets, room, meals will be on customer's side.
2)Testing by seller, take videos and send to customer.
3) Third part to test the machines.
5.Factory Visit
1.We have designed a testing workshop, welcome customers to visit and see machines running any time!
2.Face to face communication by Skype calls, to show our workshop for customers.
 
Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line
Pet Bottled Drinking Water Filling Machine / Mineral Water Production Line

Welcome to Zhangjiagang Reliable Machinery Co.,Ltd ! 
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours